CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Dharahara reconstruction continues even during lockdown

CEO TAB by CEO TAB
April 20, 2020
in Prime News
0
Dharahara reconstruction continues even during lockdown
75
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

-Sharmila Pathak

You might also like

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

Four South Asian Countries Sign Deal to Share Advance Trade Information

Kathmandu, April 19 : Reconstruction of the historic monument, Dharahara, in the federal capital has been going on even when the entire country is under a lockdown. The government announced the lockdown on March 24 to prevent the spread of COVID-19.

Two hundred regular workers were carrying out the reconstruction works until March 22. Most of them were Nepalis while 20 were Bengalis. The Nepali workers from Saptari and Dang went home by various means after the enforcement of the lockdown. However, the Bengali workers could not go to their home and the National Reconstruction Authority (NRA) has made arrangements for them to continue working by adopting adequate safety measures.

These workers are currently are currently engaged in ‘micro-pile’, the construction of pillar below the foundation. The construction company has made arrangements for their food and accommodation, said Rajuman Manandhar, the Chief of the NRA’s Public Building and Infrastructure Division. According to him, 38 per cent reconstruction works of Dharahara have been completed so far with the RCC up to 10 storeys of the Dharaha having been done. Till date, Rs 960 million has been spent in the Dharahara reconstruction.

The nine-storied Dharahara, an iconic tower that dominated Kathmandu’s skyline, was completely destroyed by the Gorkha Earthquake on April 25, 2015. Prime Minister KP Sharma Oli had laid the foundation stone for the construction of a new Dharahara on December 28, 2019. The Raman Construction Company Limited is constructing the new Dharahara.

The new Dharahara would be built in the same architectural style as the old one but would have larger diametre and would be 72 metres tall. It would have 22 storeys. The new Dharahara would also have two elevators along with the traditional stairs leading up to the top. A garden, museum, colourful fountain, exhibition hall, parking lot and shops would also be constructed on its premises. The total estimated cost of the new Dharahara is Rs 3.48 billion. RSS

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

by CEO Tab
August 21, 2026
0
Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Nepal’s hydropower sector recorded a sharp improvement in financial performance in the fiscal year 2025/26, with 106 hydropower companies listed on the Nepal Stock Exchange (NEPSE) reporting a...

Read more

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

by CEO Tab
August 21, 2026
0
Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

The Finance Committee of the Federal Parliament has decided to amend the Nepal Rastra Bank Act, proposing to limit the regular tenure of the central bank’s top officials...

Read more

Four South Asian Countries Sign Deal to Share Advance Trade Information

by CEO Tab
August 21, 2026
0
Four South Asian Countries Sign Deal to Share Advance Trade Information

Nepal, Bhutan, Bangladesh and the Maldives have signed an agreement to exchange advance information on goods traded across their borders, in a move aimed at facilitating regional trade...

Read more

Government Moves to Introduce Seasonal Electricity Tariffs

by CEO Tab
August 21, 2026
0
Government Moves to Introduce Seasonal Electricity Tariffs

The government has intensified preparations to reduce electricity tariffs through a proposed ‘seasonal tariff’ system, under which electricity prices would be lowered during the rainy season when surplus...

Read more

Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

by CEO Tab
August 19, 2026
0
Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

The government has set ambitious deadlines to complete six long-delayed national pride irrigation projects, with completion targeted within the next two to five years. The Ministry of Energy,...

Read more
Next Post

Nepali workers on holiday risk losing their jobs

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.