CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Koshi highway connecting Nepal, China, and India soon: PM Oli

CEO TAB by CEO TAB
November 12, 2020
in Prime News
0
Koshi highway connecting Nepal, China, and India soon: PM Oli
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

-Bhabin Karki

You might also like

Nepal’s Trade Costs 44% Higher Than SAFTA Average: Govt Report

APF Tightens Border Monitoring to Curb Revenue Leakage

FDI Commitments Near Rs 41.79 Billion in Nine Months

Kimathanka, November 11: Prime Minister KP Sharma Oli carried out an onsite visit to Kimathanka checkpoint and North-South highway on Wednesday. On the occasion, he expressed the belief that the two would be connected with each other soon. Saying that the North-South Koshi highway is an important road of the country to connect with China, India, and Nepal, he shared that the government has given priority to it.

Prime Minister Oli carried out aerial inspection of North-South Koshi highway. The Prime Minister shared that responsibility has already been given to Nepali Army to open the track at Kimathanka, adding that Kimathanka would become very close after construction of North-South Koshi road section. Oli reiterated that he would not tender resignation from the post of prime minister as he has become the head of the government to establish stability after being elected by the people.

Prime Minister Oli urged all not to run after the rumor of a split in Nepal Communist Party, arguing that a rumor has been spread regarding the party split into recent periods. The Prime Minister said that he was satisfied with the construction activities of the Arun III Hydropower Project. PM Oli had carried out an aerial inspection of Pukhuwa, the powerhouse construction site of the project, and the dam construction area. On the occasion, Chief Executive of the Arun III hydel project Arun Dhiman shared that round-the-clock work was being done with the help of 2,400 workers. Three assistant tunnels and the diversion tunnel to reach the powerhouse from the dam site have already been constructed. According to the Project Development Agreement, the 900 MW capacity project is expected to be completed by 2022. The total cost of the project is Rs.

One 144 billion, with Nepal getting 21.9 per cent of the power free of cost. Likewise, the locals affected by the project receive shares worth 1.06 billion rupees and 30 unit power per month. The project has to be handed over to Government of Nepal after 25 years of completion of the project. Prime Minister Oli was accompanied by Minister for Physical Infrastructure and Transport Basant Nembang, Chief Minister of State-1 Sherdhan Rai, parliamentarians and other leaders in the onsite inspection. RSS

Tags: Koshi highwayKP Sharma OliPrime Minister
Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Nepal’s Trade Costs 44% Higher Than SAFTA Average: Govt Report

by CEO Tab
April 16, 2026
0
“Issues of price increment of petroleum goods will be resolved”

Nepal’s trading cost is 44 percent higher than those of member countries of the South Asian Free Trade Area (SAFTA), according to a new government report highlighting deep-rooted...

Read more

APF Tightens Border Monitoring to Curb Revenue Leakage

by CEO Tab
April 16, 2026
0
Exports of Nepali goods double in four months

The Armed Police Force (APF) Nepal has intensified monitoring at eastern border customs points, including Kakarbhitta, in a bid to control revenue leakage. The move follows growing concerns...

Read more

FDI Commitments Near Rs 41.79 Billion in Nine Months

by CEO Tab
April 16, 2026
0
FDI commitment declined 60% during five months

Foreign Direct Investment (FDI) commitments in Nepal have reached nearly Rs 41.79 billion in the first nine months of the current fiscal year, according to the Department of...

Read more

Nationwide Economic Survey Begins, 5,000 Personnel Deployed

by CEO Tab
April 15, 2026
0
Nepal’s Second Economic Census to Begin on March 15

The second nationwide economic survey has commenced today, with the National Statistics Office (NSO) confirming that enumerators and supervisors have already been deployed to their assigned areas. The...

Read more

Govt Unveils Ambitious Plan for 7% Growth and $100 Billion Economy

by CEO Tab
April 15, 2026
0
OPMCM

The government has pledged to achieve an average economic growth rate of 7 percent over the next five years, with targets to raise per capita income to $3,000...

Read more
Next Post
green tea leaves

Favorable weather helps improve tea production

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.