CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

‘Government to make policy to reduce import of petroleum products’

CEO Tab by CEO Tab
December 26, 2021
in Prime News
0
NOC slashes petroleum products' price by Rs 2 a liter
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Minister for Energy, Hydropower and Irrigation Pampha Bhusal has said a policy would be formulated and implemented effectively to increase the consumption of electricity and reduce the import of petroleum products.

You might also like

Government Announces Relief Package for Entrepreneurs Affected by Bhotekoshi Floods

Bhotekoshi Flood Halts Nepal’s Electricity Exports to Bangladesh

Nepal-China Trade Rerouted Through Korala Checkpoint Following Rasuwa Border Closure

Minister Bhusal said during a press meet organized at the ministry. “Establishment of big industries for the consumption of power would be encouraged and use of electric vehicles promoted by the new policy and will reduce import of petroleum products,” she underscored.

For it, discussions with various bodies and private associations were underway, according to her. Similarly, the Minister informed that a consumer-friendly electricity distribution regulation was prepared by changing the old one. Now onwards, the consumers will get the electricity at any time they demand.

The power supply of 100 kV is ensured to all and of 200 kV to the chilling center, community dairy, drinking water, and irrigation from the Nepal Electricity Authority (NEA) transfer itself. Moreover, even the tenants can take a separate meter from NEA and consume power accordingly.

This provision can benefit hundreds of thousands of tenants living in the city. Nepal would be fully electrified within two years with the cooperation between NEA and Alternative Energy Promotion Centre.

Similarly, the construction of the national pride projects relating to irrigation was intensified, Bhusal added. The electricity tariff for the charging stations of electric vehicles was fixed and the charging stations were being set up across the country.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Government Announces Relief Package for Entrepreneurs Affected by Bhotekoshi Floods

by CEO Tab
September 4, 2026
0
Government Announces Relief Package for Entrepreneurs Affected by Bhotekoshi Floods

The government has announced a comprehensive revival package for entrepreneurs affected by the devastating Bhotekoshi floods, offering customs duty exemptions, concessional loans, and loan restructuring facilities. The measures...

Read more

Bhotekoshi Flood Halts Nepal’s Electricity Exports to Bangladesh

by CEO Tab
September 4, 2026
0
Bhotekoshi Flood Halts Nepal’s Electricity Exports to Bangladesh

The devastating Bhotekoshi-Trishuli flood has disrupted Nepal’s emerging electricity trade with Bangladesh, bringing power exports to a complete halt after key hydropower projects along the Trishuli corridor were...

Read more

Nepal-China Trade Rerouted Through Korala Checkpoint Following Rasuwa Border Closure

by CEO Tab
September 4, 2026
0
Nepal-China Trade Rerouted Through Korala Checkpoint Following Rasuwa Border Closure

Nepal-China trade has increasingly shifted to the Korala checkpoint in Mustang following the closure of the Rasuwagadhi-Kerung border crossing after the devastating Bhotekoshi flood on August 26. Before...

Read more

Maruti Cements Donates Rs 11.1 Million to Prime Minister’s Relief Fund

by CEO Tab
September 4, 2026
0
Maruti Cements Donates Rs 11.1 Million to Prime Minister’s Relief Fund

Maruti Cements Limited has contributed Rs 11.1 million to the Prime Minister’s Relief Fund to support people affected by the devastating Bhotekoshi flood. The cheque was handed over...

Read more

Over Rs 5.20 Billion Raised for Bhotekoshi Flood Victims in Eight Days

by CEO Tab
September 3, 2026
0
Over Rs 5.20 Billion Raised for Bhotekoshi Flood Victims in Eight Days

More than Rs 5.20 billion has been collected in the Prime Minister’s Disaster Relief Fund within eight days to support the rescue and relief of victims of the...

Read more
Next Post
Nepal Airlines to operate  daily flight in Kathmandu-Delhi route

NAC occupied a 25% share in international destinations in 2020

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.