CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Upper Tamor ‘A’ Hydropower Project prepares EIA report

CEO Tab by CEO Tab
July 23, 2023
in Prime News
0
Construction of 216 MW Upper Trishuli-1 gains momentum
75
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Upper Tamor ‘A’ Hydropower Project has finalized its Environmental Impact Assessment (EIA) report.

You might also like

Finance Minister Announces ‘Response Desk’ to Address Private Sector Concerns

Banks Burdened by Rising Bad Loans as Unsold Collateral Tops Rs 46.8 Billion

Paddy Plantation Reaches 85.72% Across Nepal as Monsoon Boosts Cultivation

According to Union Hydropower Limited, the developer of the Upper Tamor ‘A’, it has recently submitted its EIA report at the Department of Environment for final approval. The proposed project to be built in Tamor River located in Phattanglung Rural Municipality of Taplejung district will have an installed capacity of 60 MW.

The hydropower project is estimated to cost Rs 12.85 billion for its construction. Per megawatt cost of electricity produced by the project will be Rs 222.11 million.

The project has estimated its electricity production at 333.822 gigawatt hours annually on an average. The estimated period of the construction of Upper Tamor ‘A’ is three years from the date of construction starts.

According to the EIA report, a total of 1,855 trees are needed to be cut for the project construction. The produced electricity will be supplied to Dhungesangu substation, which is situated 15 km from the proposed power house site, by using a 132 kV single circuit transmission line.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Finance Minister Announces ‘Response Desk’ to Address Private Sector Concerns

by CEO Tab
July 29, 2026
0
Finance Minister Announces ‘Response Desk’ to Address Private Sector Concerns

Finance Minister Dr. Swarnim Wagle has announced that the Ministry of Finance will establish a dedicated ‘Response Desk’ to promptly address the concerns of industrialists and business leaders,...

Read more

Banks Burdened by Rising Bad Loans as Unsold Collateral Tops Rs 46.8 Billion

by CEO Tab
July 29, 2026
0
Banks Burdened by Rising Bad Loans as Unsold Collateral Tops Rs 46.8 Billion

Nepal's commercial banks are facing mounting pressure from rising bad loans as borrowers struggle to repay debt and auctioned collateral remains unsold amid a prolonged economic slowdown. According...

Read more

Paddy Plantation Reaches 85.72% Across Nepal as Monsoon Boosts Cultivation

by CEO Tab
July 29, 2026
0
Paddy Plantation Reaches 85.72% Across Nepal as Monsoon Boosts Cultivation

Paddy plantation across Nepal has reached 85.72 percent of the targeted cultivation area following the full activation of the monsoon, according to the Department of Agriculture (DoA). The...

Read more

Nepal Issues Survey Permits for 99 Hydropower Projects in FY 2025/26

by CEO Tab
July 29, 2026
0
Nepal Issues Survey Permits for 99 Hydropower Projects in FY 2025/26

The Department of Electricity Development (DoED) issued survey permits to 99 hydropower projects with a combined installed capacity of 3,211 MW during fiscal year (FY) 2025/26, reflecting continued...

Read more

Nepal Meets Peak Electricity Demand Without Imports, Continues Power Exports

by CEO Tab
July 27, 2026
0
Nepal Meets Peak Electricity Demand Without Imports, Continues Power Exports

Nepal's total electricity demand has reached 73,629 megawatt-hours (MWh), with the country currently meeting domestic requirements without importing power from India, according to the Nepal Electricity Authority (NEA)....

Read more
Next Post
Farmers advised to move to court in Garima paddy crop failure case

Nepal sees a drop in paddy plantation by 20%

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.