CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Upper Tamakoshi Hydropower Project Set to Resume Partial Production by December End After Flood Damage

CEO Tab by CEO Tab
December 6, 2024
in Prime News
0
Upper Tamakoshi

Much-awaited Upper Tamakoshi Hydro Project formally starts production from Monday

74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

The 456 MW Upper Tamakoshi Hydropower Project (UTHP), which halted production following severe damage from the September floods and landslides, is set to begin partial production by the end of December.

You might also like

Gold Price Hits All-Time High in the Domestic Market

Foreign Employment Information System Integrated with National Identity Management Information System (NIDMIS)

NRB to Invest Rs 3.3 Billion from Grant and Pension Fund in Banks and Financial Institutions

The project has established a timeline for completing the necessary repairs to resume electricity generation by December 25. A team led by Kulman Ghising, the managing director of Nepal Electricity Authority (NEA), visited the site to expedite the maintenance work, aiming to alleviate the severe supply shortage expected during this winter season.

“If the repairs aren’t completed soon, the NEA will struggle to maintain supply, potentially leading to significant issues in meeting the country’s demand,” Ghising said during his visit on Wednesday.

As a temporary solution, the project plans to operate the powerhouse during peak demand hours starting mid-January. During off-peak hours, the UTHP will store water to operate the powerhouse for up to four hours daily when demand is highest.

The UTHP has been offline since the floods and landslides of September 27 and 28, which damaged the headworks and powerhouse. Additionally, a structure at the dam site in Lamabagar-1, Bigu Municipality, Dolakha, was buried in the landslides.

The damage caused by the natural disasters is estimated at Rs 2 billion. The project reports a loss of Rs 40 million in daily revenue due to the production halt.

Full operation of the UTHP is expected to take about six months. With India previously reluctant to export electricity to Nepal during the peak winter months, NEA has warned of potential power outages this dry season.

Last week, India agreed to increase its electricity supply to Nepal, allowing imports of up to 654 MW to help address winter shortages. Under this new arrangement, Nepal can import power for 20 hours daily, excluding peak hours (5-9 PM).

“Given that India has reservations about supplying electricity to Nepal until April 2025, and our internal production will also be significantly reduced, failing to restore this project could lead to serious challenges in managing our energy supply,” Ghising added.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Gold Price Hits All-Time High in the Domestic Market

by CEO Tab
October 14, 2025
0
NRB sells gold and silver coins for upcoming Tihar

The price of gold in the local market has once again reached a new record high. According to the Federation of Nepal Gold and Silver Dealers’ Association, gold...

Read more

Foreign Employment Information System Integrated with National Identity Management Information System (NIDMIS)

by CEO Tab
October 14, 2025
0
DoFE halts online service

The Foreign Employment Information Management System (FEMIS) has now been integrated with the National Identity Management Information System (NIDMIS), operated by the Department of National ID and Civil...

Read more

NRB to Invest Rs 3.3 Billion from Grant and Pension Fund in Banks and Financial Institutions

by CEO Tab
October 14, 2025
0
Interest rates not to change despite high demand for loans

Nepal Rastra Bank (NRB) has decided to invest Rs 3.3 billion from its Grant and Pension Fund in banks and financial institutions. According to a notice issued by...

Read more

Minister Ghising and South Korean Ambassador Discuss Hydropower, Green Hydrogen, and Employment Cooperation

by CEO Tab
October 14, 2025
0
Kulman-Ghising

Minister for Energy, Water Resources and Irrigation, Physical Infrastructure and Transport, and Urban Development Kulman Ghising held a courtesy meeting with South Korean Ambassador to Nepal Park Tae-young...

Read more

Real Estate Transactions in Nepal Plummet Further After Gen Z Movement

by CEO Tab
October 14, 2025
0
Real Estate Transactions in Nepal Plummet Further After Gen Z Movement

Nepal’s real estate market, which had already been slowing since the start of the current fiscal year (FY 2025/26), has witnessed a sharper decline following the Gen Z...

Read more
Next Post
Nepal’s trade deficit soars 2.15 percent to Rs 366.88 billion in Q1 of current FY

Birgunj Customs Leads Nepal's Exports with Rs 12.12 Billion in First Four Months of Fiscal Year 2024/2025

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.