CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Nepal and Japan Sign Loan Agreement for Underpass and Flyover Construction in Koteshwor–Jadibuti Corridor

CEO Tab by CEO Tab
December 5, 2025
in Prime News
0
Koteshwar to Get Two Flyovers and a Tunnel with JICA Support
76
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

The Government of Nepal has signed a loan agreement with the Government of Japan to construct an underpass and flyover along the Koteshwor–Jadibuti section. Nepal and Japan agreed on a loan of NPR 31.76 billion for the Koteshwor Intersection Improvement Project.

You might also like

Nepal’s Consumer Inflation Surges to 6.37 Percent in Mid-October

Nepal’s Foreign Currency Reserves Rise 6.8% to Rs 4.16 Trillion

Nepal Receives Rs 703.70 Billion in Remittances in First Three Months, Up 27.2 Percent

At a program held in Kathmandu, representatives from both countries exchanged documents and finalized the agreement. The project, to be operated with support from the Japan International Cooperation Agency (JICA), is expected to bring long-term improvements to traffic management in the Kathmandu Valley.

Once the flyovers and underpass are built, vehicular movement along Kathmandu, Lalitpur, Bhaktapur and the BP Highway is expected to become smoother, significantly reducing traffic congestion. The project will be implemented through the Department of Roads under the Ministry of Physical Infrastructure and Transport.

The loan agreement was signed in the presence of Finance Minister Rameshwor Prasad Khanal at a ceremony organized at the Ministry of Finance on Wednesday. Japan has provided concessional loan assistance equivalent to 34.59 billion Japanese Yen, approximately NPR 31.76 billion. According to the ministry, the loan will have a grace period of 10 years, a repayment period of 30 years and an annual interest rate of 0.2 percent.

Finance Secretary Dr. Ghanshyam Upadhyay and Japanese Ambassador to Nepal, Maeda Toru, signed the related loan agreement. Likewise, Joint Secretary Dr. Dhaniram Sharma from the International Economic Cooperation Division and JICA Nepal Chief Representative Mitsuzaki Masuki signed the implementation agreement.

Following the signing ceremony, JICA Nepal Chief Representative Mitsuzaki Masuki, Ambassador Maeda Toru and Minister Khanal expressed commitment to strengthening bilateral cooperation and advancing the project effectively.

The Japanese ambassador highlighted that the project, executed through Japan’s concessional loan, would significantly improve the Valley’s traffic system. Addressing the event, Minister Khanal said the project’s objective is to ease traffic congestion in one of Kathmandu’s busiest areas, ensuring long-term improvement in urban traffic management.

The program was attended by senior officials from the Ministry of Finance, Ministry of Physical Infrastructure and Transport, Department of Roads, the Japanese Embassy and JICA Nepal. According to the ministry, the cabinet meeting held on Bhadra 2 had approved the concessional loan agreement for constructing two flyovers and one underpass in Koteshwor.


Flyover and Underpass in Koteshwor

JICA has already completed the preliminary feasibility study for the flyover and underpass. As per the design, a 600-meter-long flyover will be constructed from the Thapagaun–Tinkune bridge up to the area near Munibhairav Temple in Koteshwor. From near the temple, a 700-meter-long underpass will be built stretching toward Jadibuti, along the eastern perimeter of Tribhuvan International Airport.

Another flyover, 238 meters long, will connect Jadibuti Chowk to the Manohara River bridge, according to the department. The ministry stated that, unlike the model used in Gwarko, the Koteshwor flyover will be built with pillars spaced intermittently. The underpass will follow the “cut-and-cover” model, not a deep-excavation tunnel like the one built in Nagdhunga.

Because the terrain is relatively flat, engineers from the ministry noted that the cut-and-cover method is suitable for Koteshwor.

JICA plans to complete all construction work by August 2033. A detailed timeline has been prepared from contract signing to final handover.

According to the official work schedule:

  • Loan signing: September 2025
  • Loan effectiveness: December 2025
  • Appointment of consultants: May 2026
  • Detailed design preparation: June 2026 – May 2027
  • Contractor selection: June 2027
  • Contract signing: April 2028
  • Project completion: August 2033

The Ministry stated that the Civil Aviation Authority of Nepal (CAAN) has responded positively to building an underpass in Koteshwor. JICA had studied multiple alternatives to reduce traffic congestion in the area before this model was finalized.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Nepal’s Consumer Inflation Surges to 6.37 Percent in Mid-October

by CEO Tab
November 20, 2026
0
Nepal’s Consumer Inflation Surges to 6.37 Percent in Mid-October

Consumer price inflation in Nepal surged to 6.37 percent in mid-October of the current fiscal year, more than four times the 1.47 percent recorded during the same period...

Read more

Nepal’s Foreign Currency Reserves Rise 6.8% to Rs 4.16 Trillion

by CEO Tab
November 20, 2026
0
Nepal’s Foreign Currency Reserves Rise 6.8% to Rs 4.16 Trillion

Nepal’s foreign currency reserves increased by 6.8 percent to reach Rs 4.16 trillion as of mid-October in the current fiscal year, strengthening the country’s capacity to finance imports....

Read more

Nepal Receives Rs 703.70 Billion in Remittances in First Three Months, Up 27.2 Percent

by CEO Tab
November 20, 2026
0
Nepal Receives Rs 703.70 Billion in Remittances in First Three Months, Up 27.2 Percent

Nepal received remittances worth Rs 703.70 billion in the first three months of the current fiscal year, marking a 27.2 percent increase compared to the same period last...

Read more

NEA to Sign Power Purchase Agreements for 1,000 MW of Government-Owned Projects

by CEO Tab
November 20, 2026
0
NEA to Sign Power Purchase Agreements for 1,000 MW of Government-Owned Projects

The Nepal Electricity Authority (NEA) is preparing to sign Power Purchase Agreements (PPAs) for around 1,000 MW of electricity generated by government-owned companies, paving the way for faster...

Read more

NEA Secures Approval to Import 350 MW of Electricity from India for Winter

by CEO Tab
November 18, 2026
0
NEA Secures Approval to Import 350 MW of Electricity from India for Winter

The Nepal Electricity Authority (NEA) has received approval to import 350 MW of electricity from India to meet domestic demand during the upcoming winter season. India’s Central Electricity...

Read more
Next Post
Supreme Court

SC Verdict Offers Relief to BFIs on Disposal of Non-Banking Assets

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.