CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Cold Weather Reduces Hydropower Generation in Rasuwa

CEO Tab by CEO Tab
December 15, 2025
in Prime News
0
Power Trading Company gets permission for int’l power trading
75
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

As temperatures continue to drop in the Himalayan district of Rasuwa, hydropower generation has been affected due to declining water levels in rivers and streams. According to concerned entrepreneurs, increased cold in the upper regions has slowed snowmelt and caused water to freeze, leading to reduced river flow and, consequently, lower electricity production.

You might also like

Government Approves Rs 1.5 Billion Subsidy for Sugarcane Farmers

NRB Tightens Reporting Rules for Remittance Companies

Nepal Ranks 90th in Global Economic Freedom Index

In recent days, power generation has fallen well below capacity at several hydropower projects in the district. The 22-megawatt Chilime Hydropower Project has been generating only 16 megawatts, while the 14.8-megawatt Upper Sanjen project is producing just 6 megawatts. Similarly, the 42.5-megawatt Lower Sanjen project is generating 30 megawatts, and the 78-megawatt Sallasungi project is producing only 5 megawatts, according to information from the respective projects.

Engineer Raju Shrestha of Sallasungi Hydropower said that extreme cold has significantly reduced electricity generation. “Due to severe cold, water levels in the rivers have dropped sharply. With reduced water flow, we are compelled to generate electricity below capacity. After Chaitra, the rate of snowmelt increases, water flow improves, and power generation gradually returns to full capacity,” he said.

Meanwhile, the 111-megawatt Rasuwagadhi Hydropower Project, which was damaged by floods last Asar, has resumed partial operation following reconstruction. Rasuwagadhi Hydropower Company Chief Executive Officer Satyaram Jyakhu said the project is currently generating 37 megawatts of electricity.

He added that once the reconstruction of structures affected by flooding in local streams is fully completed, the project is expected to generate around 65 to 70 megawatts of electricity during the winter season.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Government Approves Rs 1.5 Billion Subsidy for Sugarcane Farmers

by CEO Tab
October 9, 2026
0
Government Approves Rs 1.5 Billion Subsidy for Sugarcane Farmers

Minister for Agriculture, Forests and Environment Gita Chaudhary has approved the procedure for distributing more than Rs 1.5 billion in incentive subsidies to sugarcane farmers in the current...

Read more

NRB Tightens Reporting Rules for Remittance Companies

by CEO Tab
October 9, 2026
0
NRB Tightens Reporting Rules for Remittance Companies

Nepal Rastra Bank (NRB) has tightened reporting requirements for remittance companies and financial institutions involved in remittance services, requiring them to submit daily transaction details within three days....

Read more

Nepal Ranks 90th in Global Economic Freedom Index

by CEO Tab
October 9, 2026
0
Nepal Ranks 90th in Global Economic Freedom Index

Nepal has dropped one position to 90th among 165 countries in the 2026 Economic Freedom of the World report, despite a slight improvement in its overall score. According...

Read more

CAAN Bars Airlines from Raising Airfares During Dashain

by CEO Tab
October 9, 2026
0
CAAN Bars Airlines from Raising Airfares During Dashain

The Civil Aviation Authority of Nepal (CAAN) has directed domestic airlines not to increase ticket prices during Dashain amid growing complaints about soaring airfares during the festival season....

Read more

NEPSE Gains 11.96 Points to Close at 2,578.73

by CEO Tab
October 6, 2026
0
NEPSE Gains 11.96 Points to Close at 2,578.73

Nepal’s stock market rebounded on Tuesday after falling for two consecutive sessions, with the NEPSE index rising 11.96 points to close at 2,578.73. Most subgroups posted gains, while...

Read more
Next Post
Melamchi’s alternative system ‘gate’ constructed

CIAA Appeals Supreme Court Verdict on Melamchi Project Corruption Case

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.