CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Tunnel works in Melamchi Water Supply Project near-final phase

CEO TAB by CEO TAB
January 14, 2020
in Prime News
0
Tunnel works in Melamchi Water Supply Project near-final phase
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Kathmandu, January 14: The finishing of the tunnel related works of the Melamchi Water Supply Project has reached the final phase. Now only 400 meters of final finishing work is left out.

You might also like

NTA Warns 73 ISPs to Clear Dues Within 15 Days or Face Legal Action

Government Plans to Issue Infrastructure Bonds Within a Year to Attract Insurance Investment

Stakeholders Push for Tax Reform, Development Focus in Upcoming Budget

The Chinese company Sino Hydro Pvt Limited had been entrusted with the responsibility to carry on with the remaining works of head and tunnel of the much-awaited drinking water project after the erstwhile Italian company CMC di Ravenna had abandoned the construction work leaving the finishing work of 2.5 kilometers of wall and 2.5-km of the floor in limbo. According to the Project’s Information Officer Rajendra Prasad Panta, if the works in the Project would continue at this pace, it would take two more months to finish the tunnel works.

The project aims to supply at least 170 million liters of water per day to the Kathmandu Valley. He also informed that construction of a dam would be completed before the next monsoon, according to him, to bring the Project into full operation by mid-July this year as stipulated and start the supply of water, construction of two water processing centers have been finished recently.

The Melamchi Water Supply Project (MWSP) is considered to be the most viable long-term alternative to ease the chronic water shortage situation within the Kathmandu Valley. The Project is designed to divert about 170 MLD of freshwater to Kathmandu Valley from the Melamchi River in Sindhupalchowk district. Augmenting this supply by adding about a further 170 MLD each from the Yangri and Larke rivers, which lie in the upstream proximity of Melamchi are also being investigated as future supply sources.

Various factors including political events during the past 6 years of MWSP and 3 years of SDP implementation did not make it possible to complete the project as planned. The withdrawal of the three co-financing development partners for the Project – the World Bank, NORAD, and SIDA resulted in a shortfall of $133 million in the originally projected cost of US$ 464 million as priced in 2000 AD. The ADB approved the proposed project restructuring, mainly reflecting the above-mentioned financial and institutional changes made during its 6 years of implementation and proposing the removal of identified obstacles in implementation, in February 2008.

After the restructuring, the Project has now been revised to a total of $317.3 million and a completion date of June 2013. The cost will be jointly funded by several agencies such as ADB (Loan 1820-NEP) – $137 m, JBIC – $ 47.5 m, JICA – $18 m, NDF – $10.5 m, OPEC – $13.7 m, and GoN – $ 90.6 million. RSS

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

NTA Warns 73 ISPs to Clear Dues Within 15 Days or Face Legal Action

by CEO Tab
May 23, 2025
0
NTA and 257 local levels sign MoU for internet service

The Nepal Telecommunications Authority (NTA) has issued a 15-day ultimatum to 73 internet service providers (ISPs) to clear their outstanding royalties and contributions to the Rural Telecommunications Development...

Read more

Government Plans to Issue Infrastructure Bonds Within a Year to Attract Insurance Investment

by CEO Tab
May 23, 2025
0
Economic Reform Commission Recommends Major Legal Overhaul and Public Sector Restructuring

The government has proposed issuing infrastructure bonds within the next year to help diversify the investment portfolio of insurance companies and mobilize long-term funds for development projects. The...

Read more

Stakeholders Push for Tax Reform, Development Focus in Upcoming Budget

by CEO Tab
May 23, 2025
0
Budget of Rs 1.751 trillion announced for fiscal year 2023/24

As the government prepares to unveil the national budget for Fiscal Year 2025/26, stakeholders have called for comprehensive tax reforms, increased development spending, and stronger policy stability to...

Read more

Jewelry Brought by Nepali Returnees Surpasses Rs 5 Billion Amid Lower Gold Prices

by CEO Tab
May 23, 2025
0
Gold price rises by Rs 500 per tola, reaches all-time high

The import of gold and silver jewelry by Nepali returnees has surged significantly, crossing Rs 5 billion in the first ten months of the current Fiscal Year (2024/25)....

Read more

Gold and Silver Prices Decline in Domestic Market

by CEO Tab
May 23, 2025
0
NRB sells gold and silver coins for upcoming Tihar

Gold prices in Nepal fell by Rs 1,100 per tola on Friday, with the new rate set at Rs 190,400, down from Rs 191,500 the previous day. According...

Read more
Next Post
Ncell brings weekly pack under ‘Mero Plan’

Ncell brings weekly pack under ‘Mero Plan’

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.