CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Construction of MWSP hampered

CEO TAB by CEO TAB
June 26, 2020
in Prime News
0
construction works of the Melamchi Water Supply Project (MWSP)

construction works of the Melamchi Water Supply Project (MWSP)

75
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

June 25 : Only 41 percent of the total workers is engaged in the construction works of the Melamchi Water Supply Project (MWSP) after the imposition of the ongoing national lockdown, reports nayapatrikadaily.com.

You might also like

Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

Before such imposition on March 24, a total of 400 workers were involved in the MWSP.  But the very number now has reduced to 164, including 104 Nepali and 60 Chinese workers.

Chief of the MWSP, Tiresh Prasad Khatri, admits that the contraction in the size of the workforce is hampering the development pace of the project.

“There are provisions for the smooth transportation of construction materials needed for the project particularly in the lockdown period, but the same is not happening. And, this now has proved another serious setback for its construction,” he further laments.

Moreover, the obstructions posed frequently by various suppliers demanding their due payments are also impeding the project development.

Meanwhile, the Ministry of Water Supply and Sanitation has flatly refused to specify a date for the completion of the much-awaited Melamchi Water Supply Project (MWSP).

During a meeting of the Development Committee under the Federal Parliament on Wednesday (June 24), Madhav Belbase, secretary of the ministry, made such a refusal.

 “The ministry does not want to get embroiled in controversy by setting the completion date for the project. Nonetheless, we are doing our best to accomplish it at the soonest,” he said.

Speaking during the meet, Minister for Water Supply and Sanitation, Bina Magar, informed that the basic infrastructure works related to the project will be completed in this fiscal so as to start supplying its water to the Kathmandu Valley from the first month i.e July/August of the upcoming fiscal.   

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

by CEO Tab
October 15, 2026
0
Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

Nepal Rastra Bank’s report for the first two months of fiscal year 2026/27 shows rising inflation alongside improvements in remittance inflows, foreign trade, the current account and foreign...

Read more

NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

by CEO Tab
October 15, 2026
0
NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

The Nepal Stock Exchange (NEPSE) gained 4.67 points on Thursday to close at 2,625.93, extending its rally to six consecutive trading days. Daily turnover rose slightly to Rs...

Read more

Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

by CEO Tab
October 15, 2026
0
Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

Banks and financial institutions (BFIs) have increased lending against shares as collateral, with outstanding loans reaching Rs 167.85 billion by mid-September 2026, according to Nepal Rastra Bank (NRB)....

Read more

NTA Fines 14 Internet Service Providers Rs 50,000 Each for Violations

by CEO Tab
October 15, 2026
0
NTA Fines 14 Internet Service Providers Rs 50,000 Each for Violations

The Nepal Telecommunications Authority (NTA) has fined 14 internet service providers Rs 50,000 each for violating approved service packages, overcharging customers and failing to inform users about changes...

Read more

NEPSE Rises 21.32 Points as Daily Turnover Falls to Rs 4.13 Billion

by CEO Tab
October 14, 2026
0
NEPSE Rises 21.32 Points as Daily Turnover Falls to Rs 4.13 Billion

The Nepal Stock Exchange (NEPSE) rose by 21.32 points to close at 2,621.26 on Wednesday, while daily turnover declined to Rs 4.13 billion from Rs 4.73 billion on...

Read more
Next Post

434 more COVID-19 cases found; Nepal's total tally hits 11,162

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.