CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Minister Bhusal insists on sustainability of hydropower sector

CEO Tab by CEO Tab
March 15, 2022
in Prime News
0
Kaligandaki 'A' hydropower station shut down for three days
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Minister for Energy, Water Resources and Irrigation, Pampha Bhusal, has said climate change risk management has gradually been a challenge for Nepal and insisted on the sustainability of the hydropower sector.

You might also like

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

Four South Asian Countries Sign Deal to Share Advance Trade Information

The latest incidences in the country suggest the growing risk of climate change impact, according to the Minister. The Minister made this statement at a program on “flood information management system in hydropower projects and cooperation and coordination with local bodies’ here today.

“Rivers and low-lying settlements in the country seem more vulnerable to climate change impact. We have records of devastating losses from incidences of landslides and floods. The hydropower sector is among the hardest-hit ones by the consequences of natural disasters. We believe the scale of climate change impact is further increasing and countries most responsible for greenhouse gas emissions should ensure compensation to the nations having no contribution to or a minimal role to heating the planet.”

She took time to insist on quality and sustainability in the construction of hydropower projects. Speaking about possible consequences from a lack of safe hydropower projects and their implications on the nation’s economy, the Minister pledged that the Ministry would act for drafting required policies and guidelines and cooperating with several bodies for the climate change risk mitigation in hydropower projects.

She went on to say that this year, the country witnessed the off-season rains and their consequences that might have been caused by the climate change impact. She praised the role of Ilam municipality and Mai Jogmai rural municipality in disaster risk mitigation through the emergency operations center at the local level.

“We continue to work to come up with required policies, rules and build an atmosphere for promoting the domestic consumption of power produced at home and exporting to India.” the Minister added.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

by CEO Tab
August 21, 2026
0
Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Nepal’s hydropower sector recorded a sharp improvement in financial performance in the fiscal year 2025/26, with 106 hydropower companies listed on the Nepal Stock Exchange (NEPSE) reporting a...

Read more

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

by CEO Tab
August 21, 2026
0
Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

The Finance Committee of the Federal Parliament has decided to amend the Nepal Rastra Bank Act, proposing to limit the regular tenure of the central bank’s top officials...

Read more

Four South Asian Countries Sign Deal to Share Advance Trade Information

by CEO Tab
August 21, 2026
0
Four South Asian Countries Sign Deal to Share Advance Trade Information

Nepal, Bhutan, Bangladesh and the Maldives have signed an agreement to exchange advance information on goods traded across their borders, in a move aimed at facilitating regional trade...

Read more

Government Moves to Introduce Seasonal Electricity Tariffs

by CEO Tab
August 21, 2026
0
Government Moves to Introduce Seasonal Electricity Tariffs

The government has intensified preparations to reduce electricity tariffs through a proposed ‘seasonal tariff’ system, under which electricity prices would be lowered during the rainy season when surplus...

Read more

Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

by CEO Tab
August 19, 2026
0
Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

The government has set ambitious deadlines to complete six long-delayed national pride irrigation projects, with completion targeted within the next two to five years. The Ministry of Energy,...

Read more
Next Post
Businesses shut in China as officials widen Covid lockdowns

Businesses shut in China as officials widen Covid lockdowns

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.