CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Govt pledges sufficient power supply in two years

CEO Tab by CEO Tab
September 5, 2022
in Prime News
0
Chitwan industries feeling heat due to irregular power supply
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Minister for Energy, Water Resources and Irrigation, Pampha Bhusal has promised that entire households would be provided with sufficient power within the next two years.

You might also like

110 MW Dudhkoshi Hydropower Project Planned in Solukhumbu

Gold and Silver Prices Drop in Nepal’s Domestic Market

MoF Considers Removing Contingency Funds from Local and Provincial Budgets

“At the moment, around 95 percent houses are electrified and the sufficient power will be provided within a couple of years.” Inaugurating the 232 kV double-circuit Butwal-Lumbini transmission line at Mainhiya of Rupandehi today, the Minister insisted on the mass use of electoral devices from irrigation to transport sectors. She urged the people to opt for electric motor vehicles.

“We plan to increase power consumption in each areas and export the surpluses to India and Bangladesh.”

At present, Nepal has supplied 400- mw of electricity to India and plans to supply 50-mw to Bangladesh as well, according to the Minister who on the occasion informed that a heavy discount (75 percent) has been ensured on electricity tariffs in the irrigation sector.

She also said that with the operation of the Butwal-Lumbini transmission line, the power supply for the industrial sector in the area would meet the demand. The Minister also thanked the project officials and contractors for completing the project within the deadline.

The Ministry Secretary, Sushil Chandra Tiwari said the government adopts a policy of increasing internal power consumption, and exporting surpluses to downsize the country’s ballooning trade deficit. On the occasion, Nepal Electricity Authority (NEA) managing director Kulman Ghising said the transmission line remained as the project of highly significance for the area.

The nation currently earned two billion Indian rupees per month from the power trade, according to him. The completion of the 18 kilometer Butwal-Lumbini transmission line has the capacity of transmitting around 200 mw of electricity. On the occasion, the Minister also inaugurated the 132/11/19 kV Mainhaniya substation.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

110 MW Dudhkoshi Hydropower Project Planned in Solukhumbu

by CEO Tab
April 20, 2026
0
Ministry of Energy to Provide Concessional Loans for Low-Income Citizens to Invest in Hydropower Shares

A 110-megawatt Dudhkoshi Hydropower Project-5 is set to be developed on the Dudhkoshi River in Solukhumbu district. According to the proposal, the project will be located across wards...

Read more

Gold and Silver Prices Drop in Nepal’s Domestic Market

by CEO Tab
April 20, 2026
0
Gold price rises by Rs 500 per tola, reaches all-time high

Gold and silver prices declined in Nepal on Monday, according to the Federation of Nepal Gold and Silver Dealers' Association. The price of gold fell by Rs 1,300...

Read more

MoF Considers Removing Contingency Funds from Local and Provincial Budgets

by CEO Tab
April 20, 2026
0
Finance_Ministry

The Ministry of Finance (MoF) is considering a proposal to exclude contingency funds—set aside for unforeseen expenses—from the budgets of provincial and local governments. A recent meeting of...

Read more

NOC Explains Rise in Fuel Prices in Nepal Amid Increasing Global Rates

by CEO Tab
April 20, 2026
0
NOC expedites petroleum storage facility construction process

Amid growing public concern over rising fuel prices in Nepal, the Nepal Oil Corporation (NOC) has clarified that domestic petroleum prices are determined by international market rates—specifically the...

Read more

NEA Invites Proposals to Modernize Electricity Bill Collection System

by CEO Tab
April 19, 2026
0
NEA invites hydropower promoters for PPA

The Nepal Electricity Authority (NEA) has called for proposals from qualified service providers to enhance the efficiency and user-friendliness of its electricity bill collection system. The authority is...

Read more
Next Post
DoC sets guidelines for cooperatives seeking merger 

DoC sets guidelines for cooperatives seeking merger 

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.