CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

DOED initiates process to construct 132 kv transmission line for Mewakhola Hydropower

CEO Tab by CEO Tab
April 8, 2024
in Prime News
0
Chitwan industries feeling heat due to irregular power supply
75
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

The Department of Electricity Development (DOED) is all set to construct a transmission line for the Mewakhola hydropower project currently under construction in Meringden Rural Municipality-3 of Taplejung. The department plans to carry electricity from Mewakhola to Dhungesanghu through the for the transmission line.

You might also like

Annapurna Region Sees Surge in Foreign Tourists at Start of 2026 Season

Nepal’s Economy Expected to Grow by 4 Percent Amid Signs of Recovery

NEPSE Revises Circuit Breaker Rules to Improve Market Stability

On Saturday, the DOED issued a public notice regarding the 132 KV power transmission line project, inviting stakeholders to provide feedback if there are any potential adverse impacts.

The transmission line will originate from the switchyard of the hydroelectric project being developed in Merringden-3. Spanning a length of 7.08 km, the line will connect to the Dhungesanghu substation of the Nepal Electricity Authority (NEA) in Maiwakhola Rural Municipality-1 through Atharai Triveni Rural Municipality-5.

The DOED’s notice mentions that United Mewakhola Hydropower Limited, a subsidiary company of the developers of the hydropower project, has applied for permission to construct the transmission line in accordance with the provisions of Section 4 of the Electricity Act, 1992.

Stakeholders have been urged to submit written responses to the DOED or the broadcasting company within 35 days if they believe that the construction and operation of the proposed transmission line will have a significant adverse effect.

The single circuit transmission line will operate at a voltage of 132,000 volts and have the capacity to transmit power up to 50 megawatts. The project will involve the construction of 25 towers, with tower distances ranging from 91.83 meters to 673.88 meters and a maximum height of 33 meters.

Approximately 14.49 hectares of land will be needed for the transmission line project, with around 0.37 hectares of land required permanently for the 25 towers. Additionally, 12.74 hectares of land will fall under the jurisdiction of the power line.

Maintaining an 18-meter jurisdiction for the transmission line (9/9 meters on either side from the midpoint) is crucial from a technical standpoint, without compromising the minimum distance as prescribed in the Electricity Regulations, 1993. The target is to complete the transmission line within 12 months.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Annapurna Region Sees Surge in Foreign Tourists at Start of 2026 Season

by CEO Tab
April 8, 2026
0
Protected areas draw nearly a million visitors in last FY

The Annapurna Conservation Area has recorded a strong influx of foreign tourists at the start of the 2026 tourist season, reflecting a steady recovery in Nepal’s travel sector....

Read more

Nepal’s Economy Expected to Grow by 4 Percent Amid Signs of Recovery

by CEO Tab
April 8, 2026
0
Nepal’s Second Economic Census to Begin on March 15

Nepal’s economy is projected to expand by around 4 percent, with gradual improvements observed across production, services, and consumption sectors, according to the National Statistics Office (NSO). NSO...

Read more

NEPSE Revises Circuit Breaker Rules to Improve Market Stability

by CEO Tab
April 8, 2026
0
10 firms keen to receive stockbrokers licenses

The Nepal Stock Exchange (NEPSE) has updated its circuit breaker rules for secondary market trading after facing criticism that the previous system disrupted smooth market operations. Following approval...

Read more

Fuel Tax Cut Benefits NOC, Not Consumers

by CEO Tab
April 8, 2026
0
Tanker drivers resume fuel transportation

The government has reduced taxes on petroleum products by 50 percent, but consumers are unlikely to see any drop in fuel prices. Instead, the savings will go entirely...

Read more

South Asia Trade Fair 2026 to Boost Regional Business in Kathmandu

by CEO Tab
April 7, 2026
0
South Asia Trade Fair 2026 to Boost Regional Business in Kathmandu

The South Asia Trade Fair 2026 is set to take place in Kathmandu from May 7 to May 11, 2026, aiming to bring together trade, industry, and service-sector...

Read more
Next Post
Thamel’s tourism business bounces back

Govt enforces new guidelines for 24-hour operation of businesses in Thamel and Durbar Marg areas

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.