CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Ground station at NAST fails to receive signals from Nepali Sat-1

CEO TAB by CEO TAB
August 11, 2020
in Prime News
0
Ground station at NAST fails to receive signals from Nepali Sat-1
76
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

-Subhanu Acharya

You might also like

NEA Secures Approval to Import 350 MW of Electricity from India for Winter

Chitwan Milk Industry Resumes Operations After 10-Month Closure

Government Spends Rs 98.87 Billion on Public Debt Servicing in Three Months

Kathmandu, August 10 : The ground station installed by Nepal Academy of Science and Technology (NAST) in its premises at Khumaltar, Lalitpur has failed to receive information yet from the first Nepali nano-satellite, Nepali Sat-1, due to technical glitches. The ground station was built to receive the image signals and other information to be sent by the Nepali Sat-1 that was launched into orbit on April 18, 2019 from the USA.

The inability to obtain the information from the Nepali Sat-1 owes to various reasons such as radio signals not matching the frequencies, old model of radio needed for obtaining and sending the information, no more manufacture of old model of radio equipment among others, informed NAST’s spokesperson Suresh Kumar Dhungel.

The 1.3 kilogramme Nepali nano-satellite assembled by two Nepali engineers was launched into orbit together with Sri Lanka’s ‘Ravan 1’ and Japan’s Ubishu. The three nano-sattelite measured 1,000 cubic centimeters in volume and 4.5 kilogrammes in weight. NAST’s Chief of Faculty of Technology, Rabindra Prasad Dhakal, shared, “NAST is currently buying its time to procure appropriate model of radio equipment from African countries. We are coordinating efforts with other member countries such as Bhutan, Japan and Bangladesh among others to obtain information provided by the Nepali Sat-1.”

The solar-powered Nepali Sat-1 has a camera with 5 megapixel capacity and has life span of three years. It takes Nepali Sat-1 around 90 minutes to orbit the Earth during which it takes pictures of the natural phenomena and sends them to ground station. Avash Maskey and Hari Ram Shrestha were involved in the construction of the nano-satellite at Kyushu Institute of Technology (Kyutech) University in Japan under the Birds-3 project. The Kyutech University had supported in the construction of Nepali Sat-1 at subsidized cost. RSS

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

NEA Secures Approval to Import 350 MW of Electricity from India for Winter

by CEO Tab
November 18, 2026
0
NEA Secures Approval to Import 350 MW of Electricity from India for Winter

The Nepal Electricity Authority (NEA) has received approval to import 350 MW of electricity from India to meet domestic demand during the upcoming winter season. India’s Central Electricity...

Read more

Chitwan Milk Industry Resumes Operations After 10-Month Closure

by CEO Tab
November 18, 2026
0
Chitwan Milk Industry Resumes Operations After 10-Month Closure

The Chitwan Milk Industry, which remained closed for 10 months due to a shortage of milk, has resumed regular operations following an improvement in milk supply. The country's...

Read more

Government Spends Rs 98.87 Billion on Public Debt Servicing in Three Months

by CEO Tab
November 18, 2026
0
Government Spends Rs 98.87 Billion on Public Debt Servicing in Three Months

The government spent Rs 98.87 billion on principal and interest payments of public debt during the first three months of the current fiscal year 2083/84. According to the...

Read more

Government Spends 23.37% of Annual Budget in First Four Months

by CEO Tab
November 18, 2026
0
Government Spends 23.37% of Annual Budget in First Four Months

The government spent 23.37 per cent of its annual budget and achieved 23.39 per cent of its revenue collection target during the first four months of Fiscal Year...

Read more

Banks Continue to Lower Fixed Deposit Interest Rates in Mangsir

by CEO Tab
November 16, 2026
0
Banks Continue to Lower Fixed Deposit Interest Rates in Mangsir

The declining trend in interest rates on fixed deposits offered by commercial banks continued in Mangsir, with the average rate falling compared to the previous month. However, most...

Read more
Next Post
Passionate To Perform

Immigration Department closes all services except most essential ones

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.