CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

NEA Assures Uninterrupted Power Supply During Tihar Festival

CEO Tab by CEO Tab
October 17, 2025
in Prime News
0
NEA invites hydropower promoters for PPA
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

The Nepal Electricity Authority (NEA) has assured that there will be no power cuts during Tihar, the Hindu festival of lights, which is set to begin soon.

You might also like

Himalaya Airlines Launches Direct Kathmandu–Shenzhen Flights

Government Allocates Rs 242.21 Billion for Employee Salaries and Benefits in FY 2026/27

Finance Minister Confident Nepal’s GDP Will Reach Rs 7.458 Trillion Next Fiscal Year

The NEA estimates that electricity demand will peak at around 1,600 megawatts (MW) on Laxmi Puja, the main day of Tihar, which falls on Monday — a figure comparable to last year’s consumption level.

According to NEA Spokesperson Rajan Dhakal, the authority is fully prepared to handle the increased demand during the festive period. “While household electricity consumption typically surges during Tihar, industrial usage declines, helping to balance the overall load,” he explained.

Preparedness for Reliable Power Supply

Last year, electricity demand in the Kathmandu Valley peaked at 390 MW on Laxmi Puja. Nepal has remained free from power outages since 2018, following the gradual phase-out of load-shedding that began in 2016, starting with Laxmi Puja as a pilot initiative.

Dhakal stated that the NEA has instructed all regional and technical units to remain on high alert to minimize disruptions caused by potential distribution system issues. “To prevent interruptions, distribution center heads, power plant managers, and technical staff nationwide will stay on standby throughout the festival,” he added.

Impact of Floods and Power Exports

Recent floods triggered by continuous rainfall damaged more than a dozen privately operated hydropower plants, disrupting over 105 MW of production. However, NEA confirmed that the state-owned hydropower plants remain fully operational, ensuring that power supply during Tihar will not be affected.

Meanwhile, Nepal’s electricity exports have continued to perform strongly. In the first two months of the current fiscal year, the country earned Rs 8.64 billion from power exports to India and Bangladesh, marking a 10.5 percent increase compared to Rs 7.82 billion during the same period last year.

Nepal currently exports around 1,000 MW of electricity to India and 40 MW to Bangladesh during the peak generation season. In FY 2024/25, total export earnings from electricity reached Rs 17.45 billion.

With stable generation, improved distribution systems, and strong export performance, NEA’s commitment to uninterrupted electricity supply this Tihar highlights the country’s continued progress toward energy reliability and efficiency.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Himalaya Airlines Launches Direct Kathmandu–Shenzhen Flights

by CEO Tab
June 2, 2026
0
Himalaya Airlines Launches Direct Kathmandu–Shenzhen Flights

Himalaya Airlines is set to launch direct flights between Kathmandu and the Chinese city of Shenzhen, widely recognized as one of China’s leading economic and technological hubs. The...

Read more

Government Allocates Rs 242.21 Billion for Employee Salaries and Benefits in FY 2026/27

by CEO Tab
June 2, 2026
0
Government Allocates Rs 242.21 Billion for Employee Salaries and Benefits in FY 2026/27

The government has allocated Rs 242.21 billion for the remuneration of government employees in the upcoming Fiscal Year (FY) 2026/27, an increase of approximately Rs 75 billion compared...

Read more

Finance Minister Confident Nepal’s GDP Will Reach Rs 7.458 Trillion Next Fiscal Year

by CEO Tab
June 2, 2026
0
Finance Minister Confident Nepal’s GDP Will Reach Rs 7.458 Trillion Next Fiscal Year

Finance Minister Dr. Swarnim Wagle has expressed confidence that Nepal’s Gross Domestic Product (GDP) will increase to Rs 7.458 trillion following the implementation of the budget for Fiscal...

Read more

Nepal Targets Additional 1,040 MW of Electricity Generation in FY 2026/27

by CEO Tab
June 2, 2026
0
Nepal Targets Additional 1,040 MW of Electricity Generation in FY 2026/27

The government has set a target of adding 1,040 megawatts (MW) of electricity to the national power system in the upcoming Fiscal Year (FY) 2026/27, increasing Nepal’s total...

Read more

Prime Minister Defends Electricity VAT, Says Revenue Will Fund Power Infrastructure Upgrades

by CEO Tab
June 1, 2026
0

Prime Minister Balendra Shah has defended the government’s decision to impose a value added tax (VAT) on electricity consumption, stating that the additional revenue will be used to...

Read more
Next Post
Chitwan industries feeling heat due to irregular power supply

Industries Begin Paying Outstanding Premium Tariffs for Dedicated and Trunk Line Electricity Use

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.