CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Nepal, India agree to strengthen power transmission system

CEO Tab by CEO Tab
January 8, 2024
in Prime News
0
Nepal, India sign long-term agreement on electricity export
75
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

Nepal and India have held important discussions and agreed on eight various topics in the energy sector.

You might also like

Nepal’s Economy Projected to Reach Rs 6.6 Trillion, but Growth Slows to 3.85%

FNCCI Reschedules 60th AGM and Leadership Election for May 4 After Court Stay

NPC Says Upcoming Budget to Emphasize Governance Reform and Long-Term Economic Growth

The 11th meeting of Nepal-India Energy Secretary level Joint Steering Committee that concluded in Chitwan today has agreed on especially the topic of strengthening the electricity transmission system.

Nabin Raj Singh, Joint Secretary at the Ministry of Energy, Water Resources and Irrigation, said the meeting discussed various agenda prepared by the Joint-secretary level Joint Task Force.

Secretary at the Ministry of Energy, Water Resources and Irrigation, Gopal Prasad Sigdel, and Secretary at India’s Ministry of Energy, Pankaj Agrawal, co-chaired the meeting.

Before this, the 11th meeting of Nepal-India Energy Joint Task Force co-chaired by Joint-Secretary Singh and Joint-Secretary of India’s Ministry of Power, Dr D Saibaba, held necessary discussions on the existing, under-construction and proposed inter-country power transmission lines, various projects having Indian investment and the related transmission line projects, among other topics. The taskforce meeting also made recommendations to the Secretary-level meeting on these topics after discussing them.

However, it is said that most of the topics agreed upon this time shall be finalized by the technical groups, as these agreements are concerned more with technical topics.

The meeting made a decision in principle only since most of the topics are more technical, according to the Nepali high officials participating in the meeting.

Both sides have agreed on expanding the capacity of the Dhalkebar-Mujaffarpur Inter-country Transmission Line to 1,000 megawatts. Required infrastructures will be constructed at the Dhalkebar substation for this purpose. At present, the export and import of 800 megawatts of electricity is taking place through this transmission line.

The Joint Technical Committee will study and make necessary decisions on the topic of utilizing this transmission line to its maximum capacity. Nepal has also been paying the transmission fees for utilizing the full capacity of this transmission line.

The high officials of the Ministry of Energy who attended the meeting said that an important agreement has been made regarding utilization of the maximum capacity of the first inter-country transmission line linking Nepal and India.

Similarly, the Joint Technical Committee shall also take the necessary decision regarding determining the capacity of electricity that can be transmitted via the Dhalkebar-Sitamadhi 400-kV transmission line being constructed by the Indian company, Satluj Vidyut Nigam. The Indian company is constructing this transmission line for exporting electricity to be produced from the Arun III Hydropower Project. This company, which is constructing the Arun-III project, has also taken responsibility for constructing other projects as well. It will take a long time before these projects are completed.

Likewise, the meeting has agreed that the Joint Technical Committee will conduct a study on the feasibility of exporting power up to 200 megawatts through the 132 kV Tanakpur Mahendranagar transmission line or other high-voltage capacity transmission lines.

The meeting has approved the process and procedure on electricity export and import between Nepal and India during the monsoon via the existing transmission lines of 132 kV capacity or less by using the power transmission system of the neighboring Indian states. These processes and procedures were prepared by the Central Electricity Authority of India in coordination with Nepal Electricity Authority (NEA) and other agencies of India.

The meeting has also given the responsibility to the Joint Working Group for construction of additional two transmission lines of higher capacity. The 400-kV Yanrupa-Purnia transmission line and the New Lamki (Dododhara)-Bareily transmission line will be constructed between Nepal and India. The objective is to construct these two transmission lines by 2028. The modality of these transmission lines will also be finalized by the Joint Working Group.

The taskforce led by the Joint-Secretaries of the Energy Ministry of the two countries will prepare the necessary modality for this.

Discussions have also been held in principle on having soon a separate tripartite agreement, in accordance with the Power Import and Export Guidelines of India, among NEA, the NTPC Vidhyut Vyapar Nigam of India and the Power Development Board of Bangladesh for the export of 40 megawatts of electricity from Nepal to Bangladesh by using India’s transmission system. 

Based on this discussion, the necessary mechanism will be established for the three-nation partnership. This mechanism will make the necessary decisions, it is said.

These agreements related to transmission line and energy sector were reached in the context of Minister of External Affairs of India Dr Subrahmanyam Jaishankar’s visit to Nepal on January 4 and 5.

The Agreement Between the Government of Nepal and the Government of India on Long Term Power Trade was signed during the visit of the Minister of External Affairs of India, opening the door for the export of 10,000 megawatts of electricity to India from Nepal in 10 years.

The Minister for Foreign Affairs of Nepal and the Minister of External Affairs of India remotely inaugurated the 132 kV cross-border transmission lines between Nepal and India, namely the second circuit of Raxaul- Parwanipur line, the second circuit of Kataiya- Kusaha line and the New Nautanwa-Mainhiya lines.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Nepal’s Economy Projected to Reach Rs 6.6 Trillion, but Growth Slows to 3.85%

by CEO Tab
April 29, 2026
0
Nepal’s Second Economic Census to Begin on March 15

Nepal’s economy is projected to reach Rs 6.6 trillion by the end of the current fiscal year (FY), marking an increase of Rs 401 billion, according to preliminary...

Read more

FNCCI Reschedules 60th AGM and Leadership Election for May 4 After Court Stay

by CEO Tab
April 29, 2026
0
Nepal trails behind many countries in 13 global indices

The Federation of Nepalese Chambers of Commerce and Industry (FNCCI) has announced that it will hold its 60th Annual General Meeting (AGM) and leadership elections on May 4....

Read more

NPC Says Upcoming Budget to Emphasize Governance Reform and Long-Term Economic Growth

by CEO Tab
April 29, 2026
0
NPC directs to carry out a feasibility study of tunnel in Myagdi

National Planning Commission (NPC) member Dr Sanjay Acharya has said the upcoming Fiscal Year (FY) 2026/27 budget will focus on strengthening good governance and laying the foundation for...

Read more

Nepal Launches One-Stop Digital Service Center to Streamline Investment Process

by CEO Tab
April 29, 2026
0
Investment Board to approve investment worth $10 billion  in 5 years

The Investment Board Nepal (IBN) has introduced a one-stop service center aimed at making investment procedures easier and more accessible for potential investors. The board has launched an...

Read more

Nepal’s Capital Gains Tax from Share Trading Falls by 36%

by CEO Tab
April 27, 2026
0
Govt collects CGT of Rs 4.23 billion in first month this FY

The government collected Rs 8.17 billion in capital gains tax (CGT) from share transactions during the first nine months of the current fiscal year, marking a 36.44 percent...

Read more
Next Post
IPPAN’s objection to the directive of the Insurance Committee

IPPAN welcomes long-term power trade agreement, calls for full opening of PPA

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.