CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Water from Rapti river to quench the thirst of Nepalgunj city

CEO TAB by CEO TAB
March 5, 2020
in Prime News
0
Water from Rapti river to quench the thirst of Nepalgunj city
75
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Nepalgunj, March 5: A project to bring water from the Rapti river has been implemented in Nepalgunj to address the acute shortage of water in the sub-metropolis.

You might also like

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

Four South Asian Countries Sign Deal to Share Advance Trade Information

The project is expected to solve the drinking water problem in the city in a sustainable manner to meet the growing demand. Site engineer with the Nepal Water Supply Corporation Nepalgunj Office, Sangeeta Thapa, said works on installation of the intake and laying the pipes have been forwarded under the plan. The project is from 20 years back.

It could not be initiated fully due to budget crunch at that time and it was revived last fiscal year. Although the project was to be completed in the fiscal year 2018/2019, it could not be completed and the project term was extended by two years. The first phase of the project is estimated to cost around Rs 180 million. Under the project, 16,817 meters long pipeline will be installed from Sindhaniyaghat, Kamdi of Duduwa rural municipality-4 up to Nepalgunj to supply water from the Rapti river.

Around 24,471 households would be benefited from the project. At present water is being supplied to the city from 420,000 liters capacity overhead tank at Karkando and another overhead tank with a capacity of 450,000 liters located near Bageshwari temple. Thapa said around 4,500 households here have fitted taps in the city. The daily demand for water is 3.5 million liters.

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

by CEO Tab
August 21, 2026
0
Interest Rate Cuts and Higher Power Demand Drive Hydropower Profits to Rs 11.11 Billion

Nepal’s hydropower sector recorded a sharp improvement in financial performance in the fiscal year 2025/26, with 106 hydropower companies listed on the Nepal Stock Exchange (NEPSE) reporting a...

Read more

Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

by CEO Tab
August 21, 2026
0
Parliamentary Panel Proposes Three-Year Tenure for NRB Top Officials

The Finance Committee of the Federal Parliament has decided to amend the Nepal Rastra Bank Act, proposing to limit the regular tenure of the central bank’s top officials...

Read more

Four South Asian Countries Sign Deal to Share Advance Trade Information

by CEO Tab
August 21, 2026
0
Four South Asian Countries Sign Deal to Share Advance Trade Information

Nepal, Bhutan, Bangladesh and the Maldives have signed an agreement to exchange advance information on goods traded across their borders, in a move aimed at facilitating regional trade...

Read more

Government Moves to Introduce Seasonal Electricity Tariffs

by CEO Tab
August 21, 2026
0
Government Moves to Introduce Seasonal Electricity Tariffs

The government has intensified preparations to reduce electricity tariffs through a proposed ‘seasonal tariff’ system, under which electricity prices would be lowered during the rainy season when surplus...

Read more

Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

by CEO Tab
August 19, 2026
0
Government Sets Two-to-Five-Year Deadline to Complete Six National Pride Irrigation Projects

The government has set ambitious deadlines to complete six long-delayed national pride irrigation projects, with completion targeted within the next two to five years. The Ministry of Energy,...

Read more
Next Post
New mechanical parking proposed to mitigate traffic inconveniences

New mechanical parking proposed to mitigate traffic inconveniences

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.