CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Two micro-hydel projects constructed in Mugu

CEO TAB by CEO TAB
December 16, 2020
in Prime News
0
Nepali migrant workers can make online payments
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Kathmandu, December 15 : Two separate micro- hydroelectricity projects constructed in the Mugu district have started power generation, the Alternative Energy Promotion Centre (AEPC) said. They were constructed with the grant assistance of AEPC at Mugum Karmarong Rural Municipality and Soru Rural Municipality in the district.

You might also like

Floods and Landslides Halt Over 900 MW of Electricity Generation Across Nepal

Nepalis Spend Rs 209 Billion on Foreign Education and Travel in One Year

QR-Based Digital Transactions Surge Threefold in Two Years

The Ghanseodar Khola Hydel Project at Mugum Karmarong is of 17 kilowatts capacity and the Rumakhola Micro Hydroelectricity Project in Soru is of 35 kilowatts capacity.

Two hundred and fifteen households would be benefitted by the Ghanseodar Khola hydel project while 350 households would be benefitted by the Rumakhola hydel project. Joint Secretary at the Ministry of Energy, Water Resources and Irrigation, Madhu Prasad Bhetuwal inaugurated the both projects.

On the occasion, he said the government has the goal of carrying out electrification in the remote villages of the district through micro hydroelectricity projects within short time and stressed on the need of sustainable operation of these projects. AEPC executive director Madhu Sudhan Adhikari said the Centre has expedited the electrification works throughout the country to make the government’s ‘Ujyalo Nepal (Bright Nepal)’ campaign successful.

He added that electrification would be carried out by means of renewable energy in places in the district without access to power. The Ghanseodhar hydel project is constructed at a cost of Rs 16 million 800 thousand, out of which Rs 6 million 460 thousand was provided by the Centre while the Rumakhola hydel project was constructed at a total cost of Rs 28 million 360 thousand, including the Rs 13.3 million, provided by the Centre. The Centre has the goal of installing 200 minigrids at 97 local levels without access to the national grid. RSS

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Floods and Landslides Halt Over 900 MW of Electricity Generation Across Nepal

by CEO Tab
September 28, 2026
0
Floods and Landslides Halt Over 900 MW of Electricity Generation Across Nepal

Incessant rainfall has triggered floods and landslides that have disrupted electricity generation and supply across Nepal, with more than 900 MW of generation capacity currently halted. According to...

Read more

Nepalis Spend Rs 209 Billion on Foreign Education and Travel in One Year

by CEO Tab
September 28, 2026
0
Nepalis Spend Rs 209 Billion on Foreign Education and Travel in One Year

Nepal saw Rs 209 billion flow out of the country for foreign education and travel in fiscal year 2025/26, reflecting the growing number of Nepalis pursuing studies and...

Read more

QR-Based Digital Transactions Surge Threefold in Two Years

by CEO Tab
September 28, 2026
0
QR-Based Digital Transactions Surge Threefold in Two Years

The frequency of QR-based digital transactions in Nepal has increased nearly threefold over the past two years, reflecting the growing adoption of digital payments for everyday economic activities....

Read more

Nepal Among World’s 10 Fastest-Improving Tourism Economies

by CEO Tab
September 28, 2026
0
Nepal Among World’s 10 Fastest-Improving Tourism Economies

Nepal has emerged as one of the world’s fastest-improving tourism economies, with its tourism performance improving by 5.1 percent between 2024 and 2026, according to the World Economic...

Read more

NEPSE Falls 17.41 Points as Investors Remain Cautious Amid Weather Concerns

by CEO Tab
September 27, 2026
0
NEPSE Falls 17.41 Points as Investors Remain Cautious Amid Weather Concerns

The Nepal Stock Exchange (NEPSE) index fell 17.41 points, or 0.66 percent, last week as investors remained cautious amid forecasts of incessant rainfall and concerns over possible disruptions...

Read more
Next Post
Samsung launches Galaxy M51 in Nepal

Samsung launches Galaxy M51 in Nepal

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.