CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Second-largest Dhalkebar substation to operate from Saturday

CEO Tab by CEO Tab
March 18, 2022
in Prime News
0
Second-largest Dhalkebar substation to operate from Saturday
76
SHARES
1.3k
VIEWS
Share on FacebookShare on Twitter

Currently, the 400 KV capacity Dhalkebar substation has come into operation in the country. The country’s second-largest substation is scheduled to be inaugurated this Saturday. The Nepal Electricity Authority (NEA) has informed that Prime Minister Sher Bahadur Deuba is scheduled to inaugurate the substation on Saturday.

You might also like

Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

NEA has named the substation New Khimti. The substation constructed at Devitar in Manthali Municipality-13 of Ramechhap has connected the double circuit 220 KV transmission line from Gongar of Dolakha to Dhalkebar. Kathmandu is connected through 132 KV capacity through the same substation. A 100 MVA transformer is connected to the substation. Electricity is flowing from the substation to Dhalkebar of Dhanusha.

According to NEA, this is the second-largest substation after Dhalkebar. According to NEA, three substations of 132, 220, and 400 KV capacity are in operation in Dhalkebar. According to Pradip Dahal, Electrical Engineer, New Khimti Substation, preparations have been completed for the inauguration program to be held by the Prime Minister on Saturday. The construction of the substation, which started in 2075 BS, was completed last June. After the initial cost was Rs 1.5 billion, there has been some variation due to natural calamities, corona, and other causes.

The electricity of the 456 MW Upper Tamakoshi Hydropower Project has been connected to the Nayakhimti substation. Similarly, electricity generated from 52 & amp; 4 MW capacity Likhu II and 24.1 MW capacity Likhu A hydropower project is connected.

Similarly, the electricity of Gorjyang Hydropower, Khimti-2 will also be connected to the same substation. According to the current capacity, a total of 900 MW of electricity can be connected to the substation, said Foreman Civil Bishwas Kumar Bhandari.

The project will be developed as a hub substation in the language of the substation authority as electricity will be connected to the completed and ready projects in Ramechhap, Dolakha and other districts. The substation was charged in the last week of July.

The NEA is confident that the operation of the substation, which is considered important for providing electricity to Upper Tamakoshi as a project of national pride, will facilitate the flow of electricity. About one billion units of electricity from Upper Tamakoshi has already flowed through this substation. Four power transformers are connected in the substation. Three of the connected transformers will be brought into regular operation and one will be in reserve.

According to the staff of the New Khimti substation, the project was completed after the regular monitoring of NEA Executive Director Kulman Ghising.

“I am just happy to be back. On top of that, we are still proud of the work we have done as the Prime Minister is about to inaugurate it, ”said Dahal, an electrical engineer.

Civil Foreman Bhandari also said that all the employees of NEA felt proud when the project was completed after a long hard work. Just a few days ago, Minister for Energy Pampha Bhusal inaugurated the completed 122/33 KV substation at Lalbandi in Sarlahi.

Similarly, New Butwal-Bardaghat 220/132 KV substation was inaugurated today. According to the Ministry of Energy, the current government has paid special attention to the development of the energy sector.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

by CEO Tab
October 15, 2026
0
Inflation Surges to 6.34% as Remittances and Foreign Reserves Rise

Nepal Rastra Bank’s report for the first two months of fiscal year 2026/27 shows rising inflation alongside improvements in remittance inflows, foreign trade, the current account and foreign...

Read more

NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

by CEO Tab
October 15, 2026
0
NEPSE Rises for Sixth Consecutive Day, Closes at 2,625.93

The Nepal Stock Exchange (NEPSE) gained 4.67 points on Thursday to close at 2,625.93, extending its rally to six consecutive trading days. Daily turnover rose slightly to Rs...

Read more

Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

by CEO Tab
October 15, 2026
0
Share-Backed Loans Surge to Rs 167.85 Billion in Nepal

Banks and financial institutions (BFIs) have increased lending against shares as collateral, with outstanding loans reaching Rs 167.85 billion by mid-September 2026, according to Nepal Rastra Bank (NRB)....

Read more

NTA Fines 14 Internet Service Providers Rs 50,000 Each for Violations

by CEO Tab
October 15, 2026
0
NTA Fines 14 Internet Service Providers Rs 50,000 Each for Violations

The Nepal Telecommunications Authority (NTA) has fined 14 internet service providers Rs 50,000 each for violating approved service packages, overcharging customers and failing to inform users about changes...

Read more

NEPSE Rises 21.32 Points as Daily Turnover Falls to Rs 4.13 Billion

by CEO Tab
October 14, 2026
0
NEPSE Rises 21.32 Points as Daily Turnover Falls to Rs 4.13 Billion

The Nepal Stock Exchange (NEPSE) rose by 21.32 points to close at 2,621.26 on Wednesday, while daily turnover declined to Rs 4.13 billion from Rs 4.73 billion on...

Read more
Next Post
Energy Minister in consultation to run e-vehicles

"Talks are underway with India for export of electricity from Nepal"

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.