CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Commercial flights to start from Gautam Buddha International Airport

CEO Tab by CEO Tab
February 18, 2022
in Prime News
0
Lockdown brings the construction of Gautam Buddha Int'l Airport to a halt
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

The Gautam Buddha International Airport, a project of national pride located in Bhairahawa (Rupandehi), is to start into commercial flights on May 16 that marks Buddha Poornima.

You might also like

Nepal Oil Corporation Keeps Existing Fuel Prices Unchanged

Nepal Government’s Capital Expenditure Stuck at 32.53% With One Month Left in Fiscal Year

BFIs’ Margin Lending Against Shares Rises 15.5% to Rs 162.53 Billion

The Civil Aviation Authority of Nepal (CAAN) has shared that the commercial test flights (calibration flight) will start on Friday. CAAN Director General Pradip Adhikari said that necessary preparations have been made for the operation of Gautam Buddha Airport as the second international airport of the country.

He mentioned that the calibration flight will be conducted for seven days. Aero Thai aircraft has landed in Nepal today for that purpose. The HS-AIM aircraft, which landed at Tribhuvan International Airport from Thailand in the afternoon, has reached Bhairahawa airport, said CAAN engineer Muluk Mishra.

After the test flight is successful, a commercial flight will take place. Bhairahawa Airport has same passenger handling capacity as TIA Director-General Adhikari shared that Gautam Buddha International Airport has same capacity as TIA when it comes to passenger handling.

Both the international airports could handle around 9.2 million passengers annually but for that to happen, another terminal should be brought into operation at the earliest at the Gautam Buddha International Airport. The current terminal at the Gautam Buddha International Airport can only handle around 2 million passengers, according to the CAAN.

The second terminal for the Gautam Buddha International Airport would be operative very soon, assured Adhikari. Stating that Gautam Buddha International Airport was of strategic importance for economic growth of the country, he asserted that Nepal’s aviation sector made another stride with the construction of soon-to-be-operated international Airport.

TIA in 2018 handled 7.1 million passengers. Had there been no COVID-19 crisis, the TIA could not handle the ever-increasing flow of passengers in the only international airport in the country so far.

The COVID-19 crisis also slowed down the technical work relating to the construction and operation process of the second international airport in the country. The commercial operation would have started if there was no COVID-19 crisis, said CAAN.

Thanks to the consistent follow-up and positive intervention of the CAAN, the Airport in Bhairahawa is going to be operative very soon. Model project The Gautam Buddha International Airport was initially a sick project but, it gained significant physical process in no time.

It has become a model project amongst the other projects of national pride due to its timely construction. The project suffered some setbacks initially. Delay and negligence on the part of the contractor company impeded the project while the COVID-19 crisis also contributed to the slowdown of construction in between.

Initiated in 2015, the Airport construction should have ideally completed by 2017. Deadline for construction was reset for March, 2020 but construction process hit snag yet again due breakout and spread of COVID-19 since 2020.

A Chinese construction company-Northwest Civil Aviation Construction Group- constructed the Airport at the subsidized loan by the Asian Development Bank. So far, Rs 11 billion has been spent on the construction of the Airport having 45-meter width and a 3,000-metre long runway.

As the Gautam Buddha International Airport is coming into operation very soon, it is believed that the second international airport in the country would help reduce the pressure of the TIA.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Nepal Oil Corporation Keeps Existing Fuel Prices Unchanged

by CEO Tab
June 16, 2026
0
Nepal Oil Corporation Keeps Existing Fuel Prices Unchanged

The Nepal Oil Corporation (NOC) has decided to continue the existing retail prices of petroleum products without any change. Although the corporation has received revised purchase prices from...

Read more

Nepal Government’s Capital Expenditure Stuck at 32.53% With One Month Left in Fiscal Year

by CEO Tab
June 16, 2026
0
Nepal Government’s Capital Expenditure Stuck at 32.53% With One Month Left in Fiscal Year

The government has spent only 32.53 percent of its allocated development budget, raising concerns over weak capital expenditure performance with just one month remaining in the current fiscal...

Read more

BFIs’ Margin Lending Against Shares Rises 15.5% to Rs 162.53 Billion

by CEO Tab
June 16, 2026
0
BFIs’ Margin Lending Against Shares Rises 15.5% to Rs 162.53 Billion

Banks and financial institutions (BFIs) in Nepal have increased their lending against share collateral by 15.5 percent, reaching a total of Rs 162.53 billion over the first 10...

Read more

NRB Flags Weak Governance, Rising Bad Loans and Regulatory Evasion in Banking Sector

by CEO Tab
June 16, 2026
0
NRB Flags Weak Governance, Rising Bad Loans and Regulatory Evasion in Banking Sector

Nepal Rastra Bank (NRB) has identified serious structural and governance-related problems in banks and financial institutions (BFIs), warning that weak oversight, rising non-performing loans, and regulatory evasion practices...

Read more

Nagdhunga–Sisnekhola Tunnel Set to Open in Mid-July as Final Preparations Near Completion

by CEO Tab
June 15, 2026
0
Nagdhunga–Sisnekhola Tunnel Set to Open in Mid-July as Final Preparations Near Completion

Nepal’s first commercial highway tunnel, the Nagdhunga–Sisnekhola Tunnel Road, is expected to come into operation from mid-July with final technical and operational preparations currently underway. According to project...

Read more
Next Post
Rice planting

Government releases Rs 1b to provide relief to farmers

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.