CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

NPC Calls for Reducing National Pride Projects to Improve Efficiency and Control Costs

CEO Tab by CEO Tab
July 14, 2026
in Prime News
0
NPC Calls for Reducing National Pride Projects to Improve Efficiency and Control Costs
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

Kathmandu: The National Planning Commission (NPC) has recommended that the government significantly reduce the number of national pride projects, arguing that a smaller and better-funded portfolio would help curb chronic delays, escalating costs, and weak implementation.

You might also like

Finance Minister Wagle Urges AIIB to Expand Investment in Nepal

Government Prepares Alternative Power Supply After 430 MW Disconnected by Bhotekoshi Flood

Insurance Authority Eases Claim Rules to Speed Compensation for Rasuwa Flood Victims

Speaking before the parliamentary Finance Committee on Monday, NPC Member-Secretary Rabilal Pantha said the current list of 27 national pride projects should be reduced to no more than 10. According to him, many of the existing projects continue to face policy, legal, financial, and practical challenges that have slowed implementation and increased costs.

“The government should prioritize a limited number of strategically important projects so that adequate financial resources can be allocated and implementation can be completed within the scheduled timeframe,” Pantha said.

His remarks come as concerns continue to grow over repeated cost overruns and delays in several of Nepal’s flagship infrastructure projects.

The Office of the Auditor General (OAG), in its 63rd Annual Report, has warned that construction costs of several national pride projects are expected to increase by as much as 113 percent due to prolonged delays and slow progress.

According to the report, the government has already spent Rs 104.92 billion on six projects under the Ministry of Energy, Water Resources and Irrigation, while their estimated total cost has risen to more than Rs 217.16 billion. Physical progress of these projects ranges between 26.65 percent and 82.27 percent, highlighting significant implementation gaps.

Similar concerns were raised in the government’s Economic Survey for Fiscal Year 2025/26, which noted that despite years of investment, many major road and highway projects remain incomplete.

The survey stated that although these initiatives have been designated as national pride projects, many have failed to achieve their targets within the stipulated timeframe, raising serious questions about project planning, efficiency, and institutional accountability.

Pantha suggested that the government review the existing criteria used to designate national pride projects. Projects that do not meet the revised standards, he said, could instead be classified as transformational or priority projects, allowing greater focus on those with national strategic importance.

He also pointed out that the number of national pride projects has expanded from 17 to 27 over the past fifteen years without corresponding improvements in project preparation, financing, or implementation capacity.

According to Pantha, efforts to introduce alternative financing instruments—including sovereign wealth bonds, offshore bonds, and thematic bonds—have failed to materialize due to inadequate coordination among the National Planning Commission, Ministry of Finance, and Nepal Rastra Bank.

During the committee meeting, Rastriya Swatantra Party (RSP) lawmaker Lima Adhikari Acharya criticized the government’s project management, saying repeated delays have placed a substantial financial burden on the state.

“Although the number of national pride projects has increased over the years, there has been insufficient prioritization and proper classification,” she said.

She also questioned whether the government conducts adequate cost-benefit analyses before approving large-scale infrastructure projects.

Several flagship projects have experienced dramatic cost escalations. The estimated cost of the Babai Irrigation Project has increased from Rs 2.87 billion to Rs 18.96 billion, while the Railway and Metro Development Project has risen from Rs 70.62 billion to Rs 955.22 billion.

Acharya further noted that projects such as the President Chure Conservation Programme and the Upper Tamakoshi Hydropower Project have also witnessed unusually large increases in project costs, underscoring the need for stronger planning, monitoring, and financial discipline.

The discussion reflects growing consensus among policymakers and oversight agencies that Nepal must shift from expanding the number of flagship projects to ensuring timely completion of a smaller number of strategically important investments. Experts argue that stronger project selection, realistic budgeting, improved inter-agency coordination, and rigorous monitoring will be essential to improve infrastructure delivery and maximize public investment.

Share30Tweet19
CEO Tab

CEO Tab

Recommended For You

Finance Minister Wagle Urges AIIB to Expand Investment in Nepal

by CEO Tab
September 30, 2026
0
Finance Minister Wagle Urges AIIB to Expand Investment in Nepal

Finance Minister Dr Swarnim Wagle has urged the Asian Infrastructure Investment Bank (AIIB) to increase investment in Nepal’s infrastructure and productive sectors while making its financing more accessible...

Read more

Government Prepares Alternative Power Supply After 430 MW Disconnected by Bhotekoshi Flood

by CEO Tab
September 30, 2026
0
Government Prepares Alternative Power Supply After 430 MW Disconnected by Bhotekoshi Flood

The government has begun making alternative arrangements after around 430 MW of electricity was disconnected from the national transmission system following damage caused by the Bhotekoshi flood to...

Read more

Insurance Authority Eases Claim Rules to Speed Compensation for Rasuwa Flood Victims

by CEO Tab
September 30, 2026
0
Insurance Authority Eases Claim Rules to Speed Compensation for Rasuwa Flood Victims

The Nepal Insurance Authority (NIA) has relaxed insurance claim procedures to ensure faster compensation for victims of the devastating Rasuwa flood of August 26. Under a special work...

Read more

Himalaya Airlines Resumes Regular Kathmandu–Shanghai Flights

by CEO Tab
September 30, 2026
0
Himalaya Airlines Resumes Regular Kathmandu–Shanghai Flights

Himalaya Airlines has resumed regular direct flights between Kathmandu and Shanghai, reconnecting Nepal with one of China’s major commercial hubs. According to the airline, regular flights from Tribhuvan...

Read more

Floods and Landslides Halt Over 900 MW of Electricity Generation Across Nepal

by CEO Tab
September 28, 2026
0
Floods and Landslides Halt Over 900 MW of Electricity Generation Across Nepal

Incessant rainfall has triggered floods and landslides that have disrupted electricity generation and supply across Nepal, with more than 900 MW of generation capacity currently halted. According to...

Read more
Next Post
BFIs Disburse Rs 162.87 Billion in Share-Backed Loans Amid Surplus Liquidity

BFIs Disburse Rs 162.87 Billion in Share-Backed Loans Amid Surplus Liquidity

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.