CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment
No Result
View All Result
CEO Tab
No Result
View All Result
Home Prime News

Bharatpur’s drinking water distribution facing obstcles

CEO TAB by CEO TAB
August 27, 2020
in Prime News
0
Bharatpur’s drinking water distribution facing obstcles
74
SHARES
1.2k
VIEWS
Share on FacebookShare on Twitter

-Krishna Acharya

You might also like

Experts Urge NRB to Refocus on SME Financing, Sector Supervision in Upcoming Monetary Policy

Electronic Payments Soar to Rs 864 Trillion as Fiscal Year Nears End

Hydropower Stocks Surge at NEPSE Despite Bhotekoshi Flood Damage

The Bharatpur metropolis has faced troubles in the supply of drinking water. Owing to the dislodgement of water supply pipes in the course of road and drainage construction, the distribution of drinking water to the metropolis denizens is being obstructed.

There is no coordination between the government agencies here in regard to the construction and expansion of roads. It has resulted in complications in the construction of roads and drainage structure.

Bharatpur drinking water board chief Prajapati Dahal shared dislodgement and breakdown of pipes mostly occurred during construction and maintenance have invited problems in the supply of drinking water. “The lockdown enforced to contain the coronavirus has aggravated the problem”, he said, adding, “There are limited human resource to fix maintenance problems in water supply system”. It is impossible for employees from far distance to come to the office due to lockdown; we are relying on limited staffs, he further shared.

“The crisis has also prevented regular maintenance and monitoring of the water supply”. The board has prioritized the areas where pipes are broken and water supply system is disrupted, he said, adding daily at least four-five complaints related to water supply are being lodged. Obviously it seems impossible to carry out necessary maintenance in such difficult time, he added. There are 16 plumbers under the Bharatpur and Krishnapur stations of the drinking water board.

Among them only seven are being mobilized in the field. The water supply pipes have been broken in course of ongoing construction of most of the roads under the Bharatpur metropolis and urban development mechanisms. Recurring problems have surfaced as the pipes placed in 1975 AD are in sorry state of affairs. The board is distributing drinking water to 30,600 residents in Bharatpur sub-metropolis. “There was a plan to expand the service but the coronavirus has affected the plan”. The board has its 850-km drinking water network. It has been supplying drinking water from ward 1 to 16 as well as ward 22 of the metropolis. RSS

Share30Tweet19
CEO TAB

CEO TAB

Recommended For You

Experts Urge NRB to Refocus on SME Financing, Sector Supervision in Upcoming Monetary Policy

by CEO Tab
July 10, 2025
0
Interest rates not to change despite high demand for loans

As the Nepal Rastra Bank (NRB) nears completion of the draft for its monetary policy for the upcoming fiscal year, financial experts and former policymakers have emphasized the...

Read more

Electronic Payments Soar to Rs 864 Trillion as Fiscal Year Nears End

by CEO Tab
July 10, 2025
0
Digital payments deal would ease cross-border payments

With just days left in the current Fiscal Year 2024/25, electronic payments in Nepal have surged dramatically, continuing a pattern of year-end financial activity fueled by government disbursements,...

Read more

Hydropower Stocks Surge at NEPSE Despite Bhotekoshi Flood Damage

by CEO Tab
July 10, 2025
0
Successful test of power production by Upper Syange project

A day after severe flooding in the Bhotekoshi River damaged several hydropower projects, energy-related companies dominated the top gainers list at the Nepal Stock Exchange (NEPSE) on Wednesday....

Read more

Flood in Bhotekoshi River Wreaks Havoc on NEA Hydropower Projects, 250 MW Cut from National Grid

by CEO Tab
July 10, 2025
0
Rasuwagadhi hydropower to start production by October

The Nepal Electricity Authority (NEA) has confirmed extensive damage to multiple hydropower projects following a devastating flood in the Bhotekoshi River early Tuesday morning, resulting in a major...

Read more

Govt Doubles Health Insurance Coverage to Rs 200,000 for Serious Illnesses Starting July 17

by CEO Tab
July 9, 2025
0
Life Insurance Sees Surge as Bank FD Rates Drop

The Government of Nepal has announced a significant expansion in its national health insurance program, doubling the coverage limit to Rs 200,000 per person. The new provision will...

Read more
Next Post
High level committee formed to study COVID-19 impacts on media

High level committee formed to study COVID-19 impacts on media

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Corporate
  • Entertainment
  • Featured
  • International
  • Major Story
  • Next Gen
  • Opinion
  • Prime News
  • Special Report
  • Tete – A – Tete

EDITOR

Manish Raj Poudel
info@ceotab.com
9841317747


PUBLISHED BY

Welcome Group
www.welcomeadnepal.com

Publisher

www.ceotab.com is a premium news portal being run by Welcome Group. The website features quality business/economic news contents,  in-depth profiles of companies, stories of struggle and success of entrepreneurs, articles that assess various dimensions of  the commerce, trade and economy.

Editor

Manish Raj Poudel

info@ceotab.com

9841317747

Sub-Editor

Riza Poudel

poudelriza@gmail.com

Archives

© 2023 CEO Tab. All rights reserved.

No Result
View All Result
  • Home
  • Prime News
  • International Market
  • Special Report
  • Corporate
  • Opinion
  • Next Gen
  • Entertainment

© 2023 CEO Tab. All rights reserved.